(403) 256–5767
(403) 561-0409
david@welltestspecialists.com
Welltest Specialists Welltest Specialists
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • 2019 Archives
  • May Archives

Month: May 2019

30 May

Alberta’s 2 kPa Rule

For shut-in durations <14 days allows for an Initial or Annual #welltest to be submitted without analysis (#PTA). Static gradient survey and ‘single shot’ AWS data are submitted electronically to the #AER in the GRD.pas format. Gradient recorders must
Read More
  • Share:
29 May

Alberta’s 2 kPa Rule

For shut-in durations <14 days allows for an Initial or Annual #welltest to be submitted without analysis (#PTA). Note the #AER computer check has built-in leniency and will accept pressure changes <±2.5 kPa/h. Static gradient and ‘single-shot’ AWS files
Read More
  • Share:
28 May

Mini-Frac’ DFIT Testing

Doubles For Initial Test… Mini-frac’ or Diagnostic Fracture Injection Tests (#DFIT) help double your #welltest efficiency if pressure gauges are downhole. G-Function analysis estimates closure stress, pore pressure, and leak-off type. After-Closure analysis may provide an estimate of flow
Read More
  • Share:
23 May

Mini-Frac’ DFIT Testing

Doubles For Initial Test… Mini-frac’ or Diagnostic Fracture Injection Tests (#DFIT) help double your #welltest efficiency if pressure gauges are downhole. Program pressure recorders for rapid data sampling (1 sec). Do a Leak-off Test (LOT) to confirm wellbore integrity.
Read More
  • Share:
22 May

Mini-Frac’ DFIT Testing

Doubles For Initial Test… Mini-frac’ or Diagnostic Fracture Injection Tests (#DFIT) help double your #welltest efficiency if pressure gauges are downhole. To satisfy #AER Initial Requirements for Oil or Gas (#LNG) wells a minimum shut-in of 8 h is
Read More
  • Share:
16 May

Mini-Frac’ DFIT Testing

Doubles For Initial Test… Mini-frac’ or Diagnostic Fracture Injection Tests (#DFIT) help double your testing efficiency if pressure gauges are downhole. First, a successful test helps estimate hydraulic fracture closure pressure and reservoir flow properties—valuable information for stimulation programs.
Read More
  • Share:
14 May

Spring Break-up

Time to plan for our #AER Annual Pressure Requirements. Surface pressure recorders are fine for an annual #welltest — the caveat for gas (#LNG) wells being that there cannot be a liquid level above the top perforation. Measuring the
Read More
  • Share:
08 May

Spring Break-up

Time to plan for our #AER Annual Pressure Requirements. D40, section 4.5.7, states that  “…the minimum number of pressure surveys should equal about 25 % of a pool’s producing well count. Based on quarter section spacing for oil pools
Read More
  • Share:

Categories

  • iReports
  • PTA Tool Kit
  • TechTips
  • Welltest Specialists Blog
  • What We Offer

Archives

  • November 2020 (1)
  • October 2020 (13)
  • September 2020 (14)
  • August 2020 (12)
  • July 2020 (9)
  • June 2020 (2)
  • May 2020 (3)
  • April 2020 (15)
  • March 2020 (11)
  • February 2020 (8)
  • January 2020 (10)
  • December 2019 (7)
  • November 2019 (9)
  • October 2019 (13)
  • September 2019 (9)
  • August 2019 (9)
  • July 2019 (8)
  • June 2019 (8)
  • May 2019 (8)
  • April 2019 (2)
  • June 2013 (1)
  • May 2013 (1)
  • April 2013 (2)
  • March 2013 (3)
  • February 2013 (2)
  • December 2012 (2)
  • July 2012 (2)
  • June 2012 (2)
  • September 2011 (1)
  • June 2011 (5)
  • May 2011 (4)

Tags

2kPa Rule AER AOF AWS BC-OGC CBM DFIT ERCB ERCB Annual Requirements ERCB initial requirements eReports Formation leak-off G-Function Gas Initial Pressure Gas Initial Pressure Oil Initial Production Test IP Gas IP Oil IPR LNG Mini-frac' Mini-frac' Fall-off PAS file Perforation Inflow Diagnostic PID PITA Pressure Transient Analysis PTA Reporting reservoir engineering Road Warrior SaaS SIR Slickline SPE Surface Technical Coaching Thermal welltest welltest analysis welltesting Wireline WTF?

Get in touch

2104 – 23rd Avenue SW
Calgary, Alberta, Canada T2T 0W1

Phone Main: (403) 256-5767

Phone Alternate: (403) 246-0535

Recent Posts

Welltest 200: PTA Tool Kit
03Nov,2020
Welltest 200: PTA Tool Kit
29Oct,2020
iReports
28Oct,2020

Signup for Blog

Subscribe to get updates for our Blog.

Loading

Quick Links

  • Home
  • Technical Coaching
  • TechTips
  • iReports
  • Coaching
  • Blog
  • Contact

© 2020 Welltest Specialists. All rights reserved. Website by Codesign