(403) 256–5767
(403) 561-0409
david@welltestspecialists.com
Welltest Specialists Welltest Specialists
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • 2020 Archives
  • Apr Archives

Month: April 2020

30 Apr

D40.6: Compliance to Minimum Requirements

Regulatory requirements are those rules that an operator has a legal obligation to meet and against which the #AER may take enforcement action in cases of non-compliance. The AER issues weekly Initial and Annual Outstanding requirements. Extensions to deadlines
Read More
  • Share:
29 Apr

Road Warrior Milestones: VoIP Soft Phones

Working from home is one thing, working from anywhere takes some special gear, know-how, and patience. We’re on the road enough that we cancelled our land line in favour of a VoIP Internet Phone Service. No change to our
Read More
  • Share:
28 Apr

D40.5: Acceptable Test Standards

The manner in which #welltests are conducted and reported is always critical to the value of data obtained. Directive 40 (D40) defines the #AER quality standards required for well tests to fulfill survey requirements. Annual
Read More
  • Share:
23 Apr

D40.5: Acceptable Test Standards

The manner in which #welltests are conducted and reported is always critical to the value of data obtained. Directive 40 (D40) defines the #AER quality standards required for well tests to fulfill survey requirements. Stabilized
Read More
  • Share:
22 Apr

Road Warrior Milestones: USB Monitors

Working from home is one thing, working from anywhere takes some special gear, know-how, and patience. One of our must-have road warrior tools to keep us lean, light, and productive while travelling, is a USB Monitor. These portable 14
Read More
  • Share:
21 Apr

D40.4: Clarification of Minimum Requirements

Well test information is critical for the prudent management of oil and gas reservoirs. Well testing is thus an integral part of the overall production and depletion strategy of a reservoir. The Alberta Energy Regulator (#AER) defines the minimum
Read More
  • Share:
16 Apr

D40.4: Clarification of Minimum Requirements

Well test information is critical for the prudent management of oil and gas reservoirs. Well testing is thus an integral part of the overall production and depletion strategy of a reservoir. The Alberta Energy Regulator (#AER) defines the minimum
Read More
  • Share:
15 Apr

Road Warrior Milestones: Backup Work

Working from home is one thing, working from anywhere takes some special gear, know-how, and patience. Road warriors know there are plenty of opportunities for problems, sometimes things just don’t work as advertised. Internet, and therefore cloud services, aren’t
Read More
  • Share:
14 Apr

D40.4: Clarification of Minimum Requirements

Well test information is critical for the prudent management of oil and gas reservoirs. Well testing is thus an integral part of the overall production and depletion strategy of a reservoir. The Alberta Energy Regulator (#AER) defines the minimum
Read More
  • Share:
09 Apr

D40.4: Clarification of Minimum Requirements

Well test information is critical for the prudent management of oil and gas reservoirs. Well testing is thus an integral part of the overall production and depletion strategy of a reservoir. The Alberta Energy Regulator (#AER) defines the minimum
Read More
  • Share:
  • 1
  • 2
  • >

Categories

  • iReports
  • PTA Tool Kit
  • TechTips
  • Welltest Specialists Blog
  • What We Offer

Archives

  • November 2020 (1)
  • October 2020 (13)
  • September 2020 (14)
  • August 2020 (12)
  • July 2020 (9)
  • June 2020 (2)
  • May 2020 (3)
  • April 2020 (15)
  • March 2020 (11)
  • February 2020 (8)
  • January 2020 (10)
  • December 2019 (7)
  • November 2019 (9)
  • October 2019 (13)
  • September 2019 (9)
  • August 2019 (9)
  • July 2019 (8)
  • June 2019 (8)
  • May 2019 (8)
  • April 2019 (2)
  • June 2013 (1)
  • May 2013 (1)
  • April 2013 (2)
  • March 2013 (3)
  • February 2013 (2)
  • December 2012 (2)
  • July 2012 (2)
  • June 2012 (2)
  • September 2011 (1)
  • June 2011 (5)
  • May 2011 (4)

Tags

2kPa Rule AER AOF AWS BC-OGC CBM DFIT ERCB ERCB Annual Requirements ERCB initial requirements eReports Formation leak-off G-Function Gas Initial Pressure Gas Initial Pressure Oil Initial Production Test IP Gas IP Oil IPR LNG Mini-frac' Mini-frac' Fall-off PAS file Perforation Inflow Diagnostic PID PITA Pressure Transient Analysis PTA Reporting reservoir engineering Road Warrior SaaS SIR Slickline SPE Surface Technical Coaching Thermal welltest welltest analysis welltesting Wireline WTF?

Get in touch

2104 – 23rd Avenue SW
Calgary, Alberta, Canada T2T 0W1

Phone Main: (403) 256-5767

Phone Alternate: (403) 246-0535

Recent Posts

Welltest 200: PTA Tool Kit
03Nov,2020
Welltest 200: PTA Tool Kit
29Oct,2020
iReports
28Oct,2020

Signup for Blog

Subscribe to get updates for our Blog.

Loading

Quick Links

  • Home
  • Technical Coaching
  • TechTips
  • iReports
  • Coaching
  • Blog
  • Contact

© 2020 Welltest Specialists. All rights reserved. Website by Codesign