(403) 256–5767
(403) 561-0409
david@welltestspecialists.com
Welltest Specialists Welltest Specialists
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • AOF

AOF

13 Oct

Welltest 200: PTA Tool Kit

More than Just PTA… Checking differentials provides added value. The operator was ready to walk away from this well due to uneconomically low gas rates. However, note the huge tubing/casing differential, not to mention the casing pressure trend shift
Read More
  • Share:
09 Sep

TechTips

Did you know that Alberta gas wells with deliverability over 300 e3m3/d require multi-rate or isochronal flow tests? Moreover, but little known, is that: if you didn’t do a multi-rate test, but did do a pressure build-up test, and
Read More
  • Share:
25 Aug

Welltest 200: PTA Tool Kit

PTA is a Completions and Workover tool when we test for skin — near wellbore damage. Oil well productivity (IPR), gas well deliverability (AOF), and water well injectivity, are all a function of flowing conditions between the rock matrix
Read More
  • Share:
22 Jul

Welltest 200: PTA Tool Kit

So are we… Re-branding with a fresh new website to publicize our Technical Coaching employee training and development material. Corporate directors, managers, and stakeholders depend on realistic, practical, advice from testing wells. Petroleum Reservoir and Production Engineering teams initiate
Read More
  • Share:
14 Apr

D40.4: Clarification of Minimum Requirements

Well test information is critical for the prudent management of oil and gas reservoirs. Well testing is thus an integral part of the overall production and depletion strategy of a reservoir. The Alberta Energy Regulator (#AER) defines the minimum
Read More
  • Share:
07 Apr

D40.3: Summary of Basic Minimum Requirements

Regulations pertinent to Alberta well testing are contained in the Oil and Gas Conservation  Regulations. Section 11.102 authorizes #AER Directive 40 (D40) to set well test requirements and standard procedures, as well as compliance and enforcement protocols.
Read More
  • Share:
13 Feb

Welltest 106: Impulse & Closed Chamber Tests

Exploitation Correlations. Exploitation correlation plots can be developed for specific fields and pools. Enough tests and end-results need to be monitored so correlations can be observed. Eventually these plots are used for making on-site real-time tie-in or fracture treatment
Read More
  • Share:
11 Feb

Welltest 106: Impulse & Closed Chamber Tests

Proving Movable Reserves. In this example a high permeability sandstone overlaid a shale zone. Decline curve analysis indicated natural gas (#LNG) reserves greater than volumetrics could justify. It was hypothesized that the shale gas reserves migrated vertically, due to
Read More
  • Share:
06 Feb

Welltest 106: Impulse & Closed Chamber Tests

Perforation Inflow Distribution Diagnostic (PIDD) Tests. The PID #welltest is analogous to production logging when two or more intervals are perforated. Based on changes to the Dp/Dt slope, gas (#LNG) inflow and AOF ratios can be estimated. Starting with
Read More
  • Share:
04 Feb

Welltest 106: Impulse & Closed Chamber Tests

Perforation Inflow Distribution Diagnostic (PIDD) Tests. The PID #welltest is analogous to production logging when two or more intervals are perforated. Based on changes to the Dp/Dt slope, gas (#LNG) inflow and AOF ratios can be estimated. Starting with
Read More
  • Share:
  • 1
  • 2
  • >

Categories

  • iReports
  • PTA Tool Kit
  • TechTips
  • Welltest Specialists Blog
  • What We Offer

Archives

  • November 2020 (1)
  • October 2020 (13)
  • September 2020 (14)
  • August 2020 (12)
  • July 2020 (9)
  • June 2020 (2)
  • May 2020 (3)
  • April 2020 (15)
  • March 2020 (11)
  • February 2020 (8)
  • January 2020 (10)
  • December 2019 (7)
  • November 2019 (9)
  • October 2019 (13)
  • September 2019 (9)
  • August 2019 (9)
  • July 2019 (8)
  • June 2019 (8)
  • May 2019 (8)
  • April 2019 (2)
  • June 2013 (1)
  • May 2013 (1)
  • April 2013 (2)
  • March 2013 (3)
  • February 2013 (2)
  • December 2012 (2)
  • July 2012 (2)
  • June 2012 (2)
  • September 2011 (1)
  • June 2011 (5)
  • May 2011 (4)

Tags

2kPa Rule AER AOF AWS BC-OGC CBM DFIT ERCB ERCB Annual Requirements ERCB initial requirements eReports Formation leak-off G-Function Gas Initial Pressure Gas Initial Pressure Oil Initial Production Test IP Gas IP Oil IPR LNG Mini-frac' Mini-frac' Fall-off PAS file Perforation Inflow Diagnostic PID PITA Pressure Transient Analysis PTA Reporting reservoir engineering Road Warrior SaaS SIR Slickline SPE Surface Technical Coaching Thermal welltest welltest analysis welltesting Wireline WTF?

Get in touch

2104 – 23rd Avenue SW
Calgary, Alberta, Canada T2T 0W1

Phone Main: (403) 256-5767

Phone Alternate: (403) 246-0535

Recent Posts

Welltest 200: PTA Tool Kit
03Nov,2020
Welltest 200: PTA Tool Kit
29Oct,2020
iReports
28Oct,2020

Signup for Blog

Subscribe to get updates for our Blog.

Loading

Quick Links

  • Home
  • Technical Coaching
  • TechTips
  • iReports
  • Coaching
  • Blog
  • Contact

© 2020 Welltest Specialists. All rights reserved. Website by Codesign