(403) 256–5767
(403) 561-0409
david@welltestspecialists.com
Welltest Specialists Welltest Specialists
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • Pressure Transient Analysis

Pressure Transient Analysis

01 May

More on Alberta Annual Pressure Survey Requirements

ERCB–D40, section 4.5.7, states that “…the minimum number of pressure surveys should equal about 25 % of a pool’s producing well count, based on quarter section spacing for oil pools. This translates to one survey per productive section. For gas
Read More
  • Share:
18 Mar

2013 ERCB Annual Pressure Requirements

The ERCB has published the 2013 list of Annual Pressure Requirements. Don’t forget that surface data and acoustic well sounder (AWS) surveys are acceptable for compliance. Since we have a whole year it is a good idea to coordinate testing
Read More
  • Share:
12 Mar

Perforation Inflow Diagnostic Tests

Perforation Inflow Diagnostic (PID) tests satisfy ERCB Initial Pressure requirements. These simplified tests, now in common usage, provide an economical alternative to traditional methods. Basically the well is perforated under-balanced, and the subsequent closed chamber pressure build-up is monitored with
Read More
  • Share:
07 Mar

Perforation, Fracture Fall-off, & Formation Leak-off Tests

Perforation, fracture fall-off, and formation leak-off tests satisfy ERCB Initial Pressure requirements. These simplified tests, now in common usage, provide an economical alternative to traditional methods. There are several different scenarios, depending on your completion operation logistics. One method is
Read More
  • Share:
20 Feb

DFIT: Doubles for Initial Test…

Mini-frac’ or Diagnostic Fracture Injection Tests (DFIT) help double your testing efficiency if subsurface pressures are recorded. First, a successful DFIT helps estimate hydraulic fracture closure pressure and reservoir flow properties – valuable information for stimulation design. Second, the resulting
Read More
  • Share:
13 Feb

ERCB Guide 40 Misconceptions Re: Initial Pressure

What’s not specifically clear in G40 is that Pressure Transient Analysis (PTA) is acceptable for estimating Initial Pressure Oil and Initial Pressure Gas conditions.      Misconception #1: all tests have to pass the 2 kPa Rule. Not
Read More
  • Share:
27 Sep

Through the Move – Breathing Easier

We are coming out the other side of closing our office and moving home. Most technical issues have been resolved – but the server is still for sale (cheap!). Now that we have time to breath I can start uploading
Read More
  • Share:
07 Jun

Sample eREPORT Level 2 (simplified)

The second sample eREPORT I’d like to point out is PTA2 Theoretical 4pt AOF – Pressure Transient Analysis Level 2. Our Level 2 eREPORT is simplified in terms of write-up: only a summary of analytical results and conclusions.  Level 2
Read More
  • Share:
02 Jun

Sample eREPORTS Uploaded

We now have a variety of sample eREPORTS available for perusal. The first one I’d like to draw your attention to is titled PTA1 Comprehensive: Pressure Transient Analysis level 1 comprehensive. This is the traditional, legacy style, turnkey eREPORT for
Read More
  • Share:

Categories

  • iReports
  • PTA Tool Kit
  • TechTips
  • Welltest Specialists Blog
  • What We Offer

Archives

  • November 2020 (1)
  • October 2020 (13)
  • September 2020 (14)
  • August 2020 (12)
  • July 2020 (9)
  • June 2020 (2)
  • May 2020 (3)
  • April 2020 (15)
  • March 2020 (11)
  • February 2020 (8)
  • January 2020 (10)
  • December 2019 (7)
  • November 2019 (9)
  • October 2019 (13)
  • September 2019 (9)
  • August 2019 (9)
  • July 2019 (8)
  • June 2019 (8)
  • May 2019 (8)
  • April 2019 (2)
  • June 2013 (1)
  • May 2013 (1)
  • April 2013 (2)
  • March 2013 (3)
  • February 2013 (2)
  • December 2012 (2)
  • July 2012 (2)
  • June 2012 (2)
  • September 2011 (1)
  • June 2011 (5)
  • May 2011 (4)

Tags

2kPa Rule AER AOF AWS BC-OGC CBM DFIT ERCB ERCB Annual Requirements ERCB initial requirements eReports Formation leak-off G-Function Gas Initial Pressure Gas Initial Pressure Oil Initial Production Test IP Gas IP Oil IPR LNG Mini-frac' Mini-frac' Fall-off PAS file Perforation Inflow Diagnostic PID PITA Pressure Transient Analysis PTA Reporting reservoir engineering Road Warrior SaaS SIR Slickline SPE Surface Technical Coaching Thermal welltest welltest analysis welltesting Wireline WTF?

Get in touch

2104 – 23rd Avenue SW
Calgary, Alberta, Canada T2T 0W1

Phone Main: (403) 256-5767

Phone Alternate: (403) 246-0535

Recent Posts

Welltest 200: PTA Tool Kit
03Nov,2020
Welltest 200: PTA Tool Kit
29Oct,2020
iReports
28Oct,2020

Signup for Blog

Subscribe to get updates for our Blog.

Loading

Quick Links

  • Home
  • Technical Coaching
  • TechTips
  • iReports
  • Coaching
  • Blog
  • Contact

© 2020 Welltest Specialists. All rights reserved. Website by Codesign