(403) 256–5767
(403) 561-0409
david@welltestspecialists.com
Welltest Specialists Welltest Specialists
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • iReports
  • Welltest 102: Production Test Reporting

Welltest Specialists Blog iReports

03 Sep

Welltest 102: Production Test Reporting

Production testing is a generic term for #welltesting through portable facilities. Usually production testing is done prior to tie-in for commercial operations. Production tests clean up wells and help define deliverability or productivity for economics and facility design. Production testing includes:

  • Underbalanced drilling; when wells are allowed to flow while drilling
  • Fracture stimulation treatment; sand and fluid clean-up operations
  • Acid wash or squeeze stimulation treatment; fluid clean-up operations
  • Various well workover, clean-up, and swabbing operations
  • Single point and multi-point gas (#LNG) flow test operations

Test facilities range from essentially none (blowing a well to atmosphere) to sophisticated, high pressure, heated, multi-phase gas/oil/water/sand #welltest separation equipment. Production testing can be continuous for several days. Companies will thus install a small camp (caravan) for employees on shift work.

Welltest 102 will focus on operations, quality control, data reporting, and data validation topics related specifically to testing petroleum wells. Note that all flow from a well is important, with respect to welltest interpretation, analysis, and reservoir engineering (#PTA); as well as regulatory (#AER) compliance.

Tags:AERLNGPTAreservoir engineeringwelltestwelltest analysis
  • Share:
David Leech

You may also like

iReports

  • October 28, 2020
  • by David Leech
  • in iReports
Looking to Expand your Repertoire? Impulse testing is done without flowing. Impulse tests are used very early in...
iReports
October 21, 2020
iReports
October 14, 2020
iReports
October 7, 2020

Categories

  • iReports
  • PTA Tool Kit
  • TechTips
  • Welltest Specialists Blog
  • What We Offer

Archives

  • November 2020 (1)
  • October 2020 (13)
  • September 2020 (14)
  • August 2020 (12)
  • July 2020 (9)
  • June 2020 (2)
  • May 2020 (3)
  • April 2020 (15)
  • March 2020 (11)
  • February 2020 (8)
  • January 2020 (10)
  • December 2019 (7)
  • November 2019 (9)
  • October 2019 (13)
  • September 2019 (9)
  • August 2019 (9)
  • July 2019 (8)
  • June 2019 (8)
  • May 2019 (8)
  • April 2019 (2)
  • June 2013 (1)
  • May 2013 (1)
  • April 2013 (2)
  • March 2013 (3)
  • February 2013 (2)
  • December 2012 (2)
  • July 2012 (2)
  • June 2012 (2)
  • September 2011 (1)
  • June 2011 (5)
  • May 2011 (4)

Tags

2kPa Rule AER AOF AWS BC-OGC CBM DFIT ERCB ERCB Annual Requirements ERCB initial requirements eReports Formation leak-off G-Function Gas Initial Pressure Gas Initial Pressure Oil Initial Production Test IP Gas IP Oil IPR LNG Mini-frac' Mini-frac' Fall-off PAS file Perforation Inflow Diagnostic PID PITA Pressure Transient Analysis PTA Reporting reservoir engineering Road Warrior SaaS SIR Slickline SPE Surface Technical Coaching Thermal welltest welltest analysis welltesting Wireline WTF?

Get in touch

2104 – 23rd Avenue SW
Calgary, Alberta, Canada T2T 0W1

Phone Main: (403) 256-5767

Phone Alternate: (403) 246-0535

Recent Posts

Welltest 200: PTA Tool Kit
03Nov,2020
Welltest 200: PTA Tool Kit
29Oct,2020
iReports
28Oct,2020

Signup for Blog

Subscribe to get updates for our Blog.

Loading

Quick Links

  • Home
  • Technical Coaching
  • TechTips
  • iReports
  • Coaching
  • Blog
  • Contact

© 2020 Welltest Specialists. All rights reserved. Website by Codesign