(403) 256–5767
(403) 561-0409
david@welltestspecialists.com
Welltest Specialists Welltest Specialists
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • TechTips
  • D62: Coalbed Methane Control Well Requirements

Welltest Specialists Blog TechTips

26 Mar

D62: Coalbed Methane Control Well Requirements

Coalbed Methane is a Biogenic #Gas, extremely high C1, plentiful here in Alberta, perfect for heating homes, ranches, greenhouses, and community centres on our clean natural gas grid. Eventually maybe even #LNG buses and trucks. Coalbed developments all require at least one #AER Control Well. Control wells may be for Desorption test and/or Pressure and Flow Control testing. Initial Pressure tests (segregated pressure for each coal zone) must be submitted within four months of Control Well authorizations. Tests conducted up to twelve months prior to the validation date are acceptable. Initial Deliverability must be tested, either Flow Meter logs (#PLT) are to be conducted over all coal zones, or segregated Flow Tests may be conducted on each coal zone. Pressure and deliverability data from coals are required to determine #CBM reserves and reservoir characteristics, including extent and continuity of the various coal zones.

Tags:AERCBMGasLNGwelltest
  • Share:
David Leech

You may also like

TechTips

  • September 16, 2020
  • by David Leech
  • in TechTips
Did you know that Mini-Frac’ or Diagnostic Fracture Injection Tests (DFIT) can “Double For Initial Tests” in Alberta...
TechTips
September 9, 2020
TechTips
September 2, 2020
TechTips
August 26, 2020

Categories

  • iReports
  • PTA Tool Kit
  • TechTips
  • Welltest Specialists Blog
  • What We Offer

Archives

  • November 2020 (1)
  • October 2020 (13)
  • September 2020 (14)
  • August 2020 (12)
  • July 2020 (9)
  • June 2020 (2)
  • May 2020 (3)
  • April 2020 (15)
  • March 2020 (11)
  • February 2020 (8)
  • January 2020 (10)
  • December 2019 (7)
  • November 2019 (9)
  • October 2019 (13)
  • September 2019 (9)
  • August 2019 (9)
  • July 2019 (8)
  • June 2019 (8)
  • May 2019 (8)
  • April 2019 (2)
  • June 2013 (1)
  • May 2013 (1)
  • April 2013 (2)
  • March 2013 (3)
  • February 2013 (2)
  • December 2012 (2)
  • July 2012 (2)
  • June 2012 (2)
  • September 2011 (1)
  • June 2011 (5)
  • May 2011 (4)

Tags

2kPa Rule AER AOF AWS BC-OGC CBM DFIT ERCB ERCB Annual Requirements ERCB initial requirements eReports Formation leak-off G-Function Gas Initial Pressure Gas Initial Pressure Oil Initial Production Test IP Gas IP Oil IPR LNG Mini-frac' Mini-frac' Fall-off PAS file Perforation Inflow Diagnostic PID PITA Pressure Transient Analysis PTA Reporting reservoir engineering Road Warrior SaaS SIR Slickline SPE Surface Technical Coaching Thermal welltest welltest analysis welltesting Wireline WTF?

Get in touch

2104 – 23rd Avenue SW
Calgary, Alberta, Canada T2T 0W1

Phone Main: (403) 256-5767

Phone Alternate: (403) 246-0535

Recent Posts

Welltest 200: PTA Tool Kit
03Nov,2020
Welltest 200: PTA Tool Kit
29Oct,2020
iReports
28Oct,2020

Signup for Blog

Subscribe to get updates for our Blog.

Loading

Quick Links

  • Home
  • Technical Coaching
  • TechTips
  • iReports
  • Coaching
  • Blog
  • Contact

© 2020 Welltest Specialists. All rights reserved. Website by Codesign