(403) 256–5767
(403) 561-0409
david@welltestspecialists.com
Welltest Specialists Welltest Specialists
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • TechTips
  • D65: Resources Applications for Oil and Gas Reservoirs

Welltest Specialists Blog TechTips

19 Mar

D65: Resources Applications for Oil and Gas Reservoirs

Planning a Section 4.3 application for Underground Gas Storage? Maximum bottomhole injection pressure and maximum average reservoir pressure data are required to define the upper limit to the operating pressures of the scheme (i.e. maximum wellhead injection pressure). A complete tabulated pressure history of the pool (date, well, type of test, stabilized pressure) is also required, with a P/Z versus cumulative gas production plot (if the pool is non-associated gas), or material balance calculations (if storage is into a gas cap in communication with an oil leg). This history indicates pressure support from the aquifer and how the reservoir may react to storage. Plan ahead, additional pool #welltesting may be required to support your application.

Tags:AERGasLNGwelltest
  • Share:
David Leech

You may also like

TechTips

  • September 16, 2020
  • by David Leech
  • in TechTips
Did you know that Mini-Frac’ or Diagnostic Fracture Injection Tests (DFIT) can “Double For Initial Tests” in Alberta...
TechTips
September 9, 2020
TechTips
September 2, 2020
TechTips
August 26, 2020

Categories

  • iReports
  • PTA Tool Kit
  • TechTips
  • Welltest Specialists Blog
  • What We Offer

Archives

  • November 2020 (1)
  • October 2020 (13)
  • September 2020 (14)
  • August 2020 (12)
  • July 2020 (9)
  • June 2020 (2)
  • May 2020 (3)
  • April 2020 (15)
  • March 2020 (11)
  • February 2020 (8)
  • January 2020 (10)
  • December 2019 (7)
  • November 2019 (9)
  • October 2019 (13)
  • September 2019 (9)
  • August 2019 (9)
  • July 2019 (8)
  • June 2019 (8)
  • May 2019 (8)
  • April 2019 (2)
  • June 2013 (1)
  • May 2013 (1)
  • April 2013 (2)
  • March 2013 (3)
  • February 2013 (2)
  • December 2012 (2)
  • July 2012 (2)
  • June 2012 (2)
  • September 2011 (1)
  • June 2011 (5)
  • May 2011 (4)

Tags

2kPa Rule AER AOF AWS BC-OGC CBM DFIT ERCB ERCB Annual Requirements ERCB initial requirements eReports Formation leak-off G-Function Gas Initial Pressure Gas Initial Pressure Oil Initial Production Test IP Gas IP Oil IPR LNG Mini-frac' Mini-frac' Fall-off PAS file Perforation Inflow Diagnostic PID PITA Pressure Transient Analysis PTA Reporting reservoir engineering Road Warrior SaaS SIR Slickline SPE Surface Technical Coaching Thermal welltest welltest analysis welltesting Wireline WTF?

Get in touch

2104 – 23rd Avenue SW
Calgary, Alberta, Canada T2T 0W1

Phone Main: (403) 256-5767

Phone Alternate: (403) 246-0535

Recent Posts

Welltest 200: PTA Tool Kit
03Nov,2020
Welltest 200: PTA Tool Kit
29Oct,2020
iReports
28Oct,2020

Signup for Blog

Subscribe to get updates for our Blog.

Loading

Quick Links

  • Home
  • Technical Coaching
  • TechTips
  • iReports
  • Coaching
  • Blog
  • Contact

© 2020 Welltest Specialists. All rights reserved. Website by Codesign