(403) 256–5767
(403) 561-0409
david@welltestspecialists.com
Welltest Specialists Welltest Specialists
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • Technical Coaching
    • TechTips
    • iReports
    • Coaching
  • Blog
  • Contact
  • Home
  • PTA Tool Kit
  • Welltest 200: PTA Tool Kit

Welltest Specialists Blog PTA Tool Kit

03 Nov

Welltest 200: PTA Tool Kit

Everything is Broken: Broken hands on broken ploughs, broken treaties, broken vows, broken pipes, broken tools, people bending broken rules…(Bob Dylan). In the spirit of global discordance, let’s look at failed #welltests… Sometimes mysterious, unusual, and bizarre things happen #welltesting, sometimes we have No Idea what went wrong… Here’s the most expensive test we’ve ever supervised. We had an original #welltest, awesome natural gas deliverability, but low confidence in the PTA forecast, because it was too short for the matrix to contribute. There was also a very expensive river crossing: not just to move test equipment across, but also for tie-in, if the test proved economic long-term deliverability. So, we designed a test with not just the matrix in mind, but also resiliency and redundancy. Two conventional strain gauges plus two top-of-the-line quartz gauges, all four subsurface pressure recorders in bomb wells, two locks, two hold-downs. All four gauges failed! Nobody had any theories why…

Tags:welltestwelltestingWTF?
  • Share:
David Leech

You may also like

Welltest 200: PTA Tool Kit

  • October 29, 2020
  • by David Leech
  • in PTA Tool Kit
Everything is Broken: Broken hands on broken ploughs, broken treaties, broken vows, broken pipes, broken tools, people bending...
Welltest 200: PTA Tool Kit
October 27, 2020
Welltest 200: PTA Tool Kit
October 22, 2020
Welltest 200: PTA Tool Kit
October 20, 2020

Categories

  • iReports
  • PTA Tool Kit
  • TechTips
  • Welltest Specialists Blog
  • What We Offer

Archives

  • November 2020 (1)
  • October 2020 (13)
  • September 2020 (14)
  • August 2020 (12)
  • July 2020 (9)
  • June 2020 (2)
  • May 2020 (3)
  • April 2020 (15)
  • March 2020 (11)
  • February 2020 (8)
  • January 2020 (10)
  • December 2019 (7)
  • November 2019 (9)
  • October 2019 (13)
  • September 2019 (9)
  • August 2019 (9)
  • July 2019 (8)
  • June 2019 (8)
  • May 2019 (8)
  • April 2019 (2)
  • June 2013 (1)
  • May 2013 (1)
  • April 2013 (2)
  • March 2013 (3)
  • February 2013 (2)
  • December 2012 (2)
  • July 2012 (2)
  • June 2012 (2)
  • September 2011 (1)
  • June 2011 (5)
  • May 2011 (4)

Tags

2kPa Rule AER AOF AWS BC-OGC CBM DFIT ERCB ERCB Annual Requirements ERCB initial requirements eReports Formation leak-off G-Function Gas Initial Pressure Gas Initial Pressure Oil Initial Production Test IP Gas IP Oil IPR LNG Mini-frac' Mini-frac' Fall-off PAS file Perforation Inflow Diagnostic PID PITA Pressure Transient Analysis PTA Reporting reservoir engineering Road Warrior SaaS SIR Slickline SPE Surface Technical Coaching Thermal welltest welltest analysis welltesting Wireline WTF?

Get in touch

2104 – 23rd Avenue SW
Calgary, Alberta, Canada T2T 0W1

Phone Main: (403) 256-5767

Phone Alternate: (403) 246-0535

Recent Posts

Welltest 200: PTA Tool Kit
03Nov,2020
Welltest 200: PTA Tool Kit
29Oct,2020
iReports
28Oct,2020

Signup for Blog

Subscribe to get updates for our Blog.

Loading

Quick Links

  • Home
  • Technical Coaching
  • TechTips
  • iReports
  • Coaching
  • Blog
  • Contact

© 2020 Welltest Specialists. All rights reserved. Website by Codesign